COUNTY SERVICE AREAS
CSA 51 (Lake Tamarisk/Desert Center)
Working with Krieger and Stewart Engineering to create total overhaul plan for water system in Lake Tamarisk
CSA 62 (Ripley)
Construction drawings in progress for bid packet Original site for interconnection deemed unviable, new location for pipeline connection being sought – new cost estimate will be prepared
CSA 122 (Mesa Verde)
350,000 gallon tank has a leak, needs to be replaced – estimated cost $60,000. Staff considering options for including it in overall water line project to Ripley. Additional capacity will improve water availability to the combined system