COUNTY SERVICE AREAS

CSA 51 (Lake Tamarisk/Desert Center)

 Working with Krieger and Stewart Engineering to create total overhaul plan for water system in Lake Tamarisk

CSA 62 (Ripley)

 Construction drawings in progress for bid packet  Original site for interconnection deemed unviable, new location for pipeline connection being sought – new cost estimate will be prepared

CSA 122 (Mesa Verde)

 350,000 gallon tank has a leak, needs to be replaced – estimated cost $60,000. Staff considering options for including it in overall water line project to Ripley. Additional capacity will improve water availability to the combined system