EDA Annual Report 2013-2014

Project Management Office

Project Management Office project managers oversee projects from inception through construction. Services include the following: Project Development, Project Management, Environmental Compliance, Facility Enhancements and Restorations, Design Development, Bid and Award, Construction Management, Plan Check and Construction Inspection. A June 2014 project status snapshot showed 148 projects in design valued at $459,211,092; 42 projects under construction valued at $89,602,954; and 135 projects completed in FY 13/14 at a value of $109,552,907. One Successor Agency project under construction is valued at $700,000; four Successor Agency projects have been completed at a value of $66,570,758.

PROJECTS IN DESIGN 54 Capital Projects are in design valued at $457,998,145 including, but not limited to: • Mental Health - 3075 Myers St TI Phase II • Mental Health - 3125 Myers St TI Phase II • Colorado River Station Structural Repair • BCTC Riverside County Primary Emergency Operations Center Relocation Project • BCTC Classrooms Infrastructure • Mead Valley Community Center Child Care Center Tenant Improvements • CAC 2nd Floor Tenant Improvements Project • RCRMC – Replace Fire Alarm Panels

PROJECTS IN CONSTRUCTION 21 Capital Projects in construction valued at $89,085,482 including, but not limited to: • Historic Courthouse Façade • Riverside Public Defender Renovation • Sheriff Retrofit Housing Units • District / Bankruptcy Courts HVAC • Desert Hot Springs Family Care Center • Mental Health – Convert Inpatient Rooms to Office Space • RCRMC Central Sterile Equipment Replacement 14 Successor Agency to the Redevelopment Agency Projects in construction valued at nearly $115 million including, but not limited to: • Brown Street Road and Drainage Improvements • Cabazon Civic Center • Deleo Regional Sports Park (Temescal Valley Regional Sports Park) • El Cerrito Road Beautification and Channel Improvements • Mead Valley Community Center • Mead Valley Library • Mead Valley Road Improvements Phases I-IV • Mecca Downtown Revitalization • Mecca Fire Station • Mission Boulevard Phase V • Palomar and Tradewinds Road Paving • Ramona and Cajalco Expressway Interchange • Rubidoux Area II and III Improvements • TLMA CAC Remodel 2nd Floor • ECDC Demo & Site Preparation • RCRMC Education Building

• Health Administration Building Environmental Health Renovation • RCRMC Operations Building (Design Build) Project • East County Detention Center Facility in Indio • East County Detention Center New Parking Structure • Countywide Correctional Facility Master Plan • TLMA Transportation Yard • Southwest Justice Center Courts Relocation • CAC 9th &10th Floor Tenant Improvements • Van Horn YOP Center 94 Non-Capital Projects in design valued at $1,212,947 including, but not limited to: • Sheriff Fence Entire Range Property • CRS Sheriff Range Storage Demolition & Construction • TLMA – RCHCA Lake Mathews Tenant Improvements • Sheriff – Perris Coroner – Replace Morgue Flooring • Woodcrest Library – Repair Stones Falling Off Walls • Desert Hot Springs Library – Replace Carpet • Probation – Riverside Juvenile Hall Space Plan & Cubicles • RCRMC Pharmacy & Infusion Center Upgrades • RCRMC Architectural & Engineering Assessment for Nurse Station • Riverside Animal Shelter Building A-HVAC Installation • Sheriff Hemet Office Renovation • Historical Courthouse Installation of HVAC System • RCRMC Electric Charging Station • 911 Communications Center – Repave Parking Lot

• RCRMC – Install Building Security System • RCRMC – Lower Level G.I. Laboratory

• RCIT Whitewater Tower – Sand Solution • Hemet Sheriff Station Office Renovation

4

Made with